10 بازدیدها· 09/26/22· سفر و رویدادها

Floor & Caulk Removal (Seq 10) | Buying a Catamaran – Sequence of Events


SV Sequence
68 مشترکین

⁣The second weekend of boat work and repairs!
With a lot of nudging, we were allowed to remove caulk, prep work, and clean areas of the boat. They began caulking and removed half of the salon floor/sole, as it was incredibly rotten.

بیشتر نشان بده، اطلاعات بیشتر

تا بعدی


0 نظرات